Impact Level: Moderate
Broadway Ave between Conklin and Flora will be closed through mid-October for a project that will widen the roadway from two lanes to three lanes with a center turn lane, sidewalks, bicycle lanes, curbs and gutters. Access to local residences and businesses remains open. A roundabout will be constructed at the Broadway / Flora intersection.
Report provided by: City of Spokane Valley
Long term road construction with speed restriction, and width limit,on US-2, from FARWELL RD to State Route 206, since 2:31 PM, 05/18/09, until further notice.
Report provided by: WSDOT
US 395 is reduced to one lane in each direction to accomodate bridge construction. A wide load detour is in effect. Drivers may experience some congestion.
Impact Level: Low
Asphalt grinding and paving underway during evening and overnight hours. Single lane traffic directed by flaggers and pilot cars. Expect delays.
Bridge construction underway. No major traffic impacts.
Chip-seal work may be underway on this highway section. When work is inderway, motorists should expect delays with flaggers and pilot cars directing single-lane traffic. Advisory speed limits are in place during chip sealing due to loose gravel.